For the most important energy project of the past 50 years, the new Ritom hydropower plant, TEICHMANN CRANES delivered a gantry crane with a load capacity of 20t in only 3.5 months - to 1,850 meters in altitude and by means of a cableway.
For the concrete manufacturer Leonhard Moll in Biebesheim, TEICHMANN CRANES delivered a 2x10t gantry crane with a span of 42m in just 4.5 months, which is used for the transport of concrete sleepers. An identical TEICHMANN gantry crane has been in operation at the concrete plant in Biebesheim since 2017.
BRUNNHUBER CRANES has manufactured a 25t double-girder overhead crane in only 6 months with an auxiliary hoist of 16t and a span of 24m. The crane will transport steel billets in a steel mill in Sweden and was manufactured to the highest German quality standards.
For the Austrian concrete manufacturer Oberndorfer, TEICHMANN CRANES delivered a refurbished 2x30t double-girder overhead travelling crane in just 3 months.
For the extension of the underground line U5 in the "European quarter" in Frankfurt, TEICHMANN CRANES delivered a 30t gantry crane within only 8 weeks, which will transport tunel segments at the tunnel construction site.
For the existing 40t gantry crane of a wind turbine manufacturer, TEICHMANN CRANES constructed and manufactured two new double-rail trolleys in just 12 weeks.
For the worldwide market leader in mechanized tunneling technology, the Herrenknecht AG, TEICHMANN CRANES delivered a refurbished double girder gantry crane with a load capacity of 80t in record timing of only 4 months.
For the sewer renovation of "Landsberger Straße" in downtown Munich, TEICHMANN CRANES has rented out a 28t gantry crane to the construction company Wayss & Freytag. The crane is used for the excavation of the launch shaft. The assembly on one of the busiest main streets in Munich in the midst of urban life was a challenge.
For a large logistics service provider, TEICHMANN CRANES successfully repaired a NOELL luffing jib crane with a load capacity of 40 tons. The harbor crane is used for unloading general cargo on the Dortmund-Ems Canal.
For the German company Poraver, the world's leading manufacturer of expanded glass granule, TEICHMANN CRANES delivered a container gantry crane with a lifting capacity of 22t in a record timing of just 4 months.