For the newly built timber module plant of timpla GmbH (by Renggli), BRUNNHUBER CRANES has supplied 22 cranes — including semi-automatic overhead cranes, console cranes, slewing cranes, and stacking cranes.
For the newly built casting maintenance hall of thyssenkrupp Steel in Duisburg, we delivered a completely refurbished double-girder overhead traveling crane with a load capacity of 60t and a span of 34m in just 3 months.
For an Austrian hydroelectric power plant, BRUNNHUBER CRANES delivered a 30 t x 10.8m gantry crane. The crane is installed on the dam of the power plant and serves as a bulkhead handling crane.
TEICHMANN CRANES delivered a 16t x 28m overhead crane to Witten for the green steel manufacturer, the Swiss Steel Group, which will be used for manufacturing of sustainable steel.
In a record-breaking delivery time of just 8 weeks, TEICHMANN CRANES delivered a rubber-tired gantry crane (RTG) to a manufacturer of modular living units in Rammingen, where the crane is needed for their storage yard. The delivery time of a new RTG is more than 24 months.
The 40 t/5 t double-rail crane trolley of a 100-year-old overhead travelling crane at ThyssenKrupp in Duisburg was due for refurbishment. Since the trolley’s steel structure was no longer usable due to its age, TEICHMANN CRANES completely rebuilt the trolley from scratch in just 12 weeks.
For the large milling company Roland Mills GmbH, TEICHMANN KRANE successfully refurbished a 1984 gantry slewing crane with a load capacity of 10 t, including the replacement of the defective slewing bearing. The port crane is used for unloading bulk goods at the Rhine-Herne Canal.
The aging Wenker gantry crane manufactured in 1971 with a span of 35t and a lifting capacity of 2x12t belonging to the Hessian construction company, Faber & Schnepp Hoch- u. Tiefbau GmbH & Co. KG, needed modernisation and was completely overhauled and modernised in just 7 weeks.
As part of the “City Link” project, new power tunnels are currently being constructed at depths of up to 100 meters. The goal is to improve the electricity supply in the greater Stockholm area, which is facing a steadily increasing energy demand due to population growth.