TEICHMANN CRANES part of Europe's biggest infrastructure project

In the course of the project more than 530km of rails for highspeed trains are build that will travel with a speed of 360 km/h (225 mph), mainly travelling through tunnels.

For the rail network between London and Birmingham TEICHMANN CRANES delivered the first of two 45tx30m gantry cranes that will supply the tunnel boring machine with tunnel segments on the construction site in Long Itchington Wood near Birmingham. 

Photocredit: Siemens/Press Association Images

Back